Hangars and Airport Buildings in Arapahoe, Wyoming

Anyone planning a hangar in Arapahoe starts with a few hard numbers: the wingspan, the tail height, the tow equipment and the date the aircraft needs cover. We turn those into a pre-engineered steel hangar with a door opening sized for the aircraft, a frame that carries the snow, and a price per square foot and lead time on one page.

The community is in the middle of Fremont County, at an elevation of 5,003 feet, in the southeast corner of the Wind River Indian Reservation, with a semi-arid climate. The land is open and the sky is large, which suits aviation, and the dry air is easy on steel. Wind is the main design driver, and the engineer sets the loads for your parcel instead of using a regional guess. A hangar door is a large flat surface, and wind on it pulls hard on the frame.

The census designated place spans 27.6 square miles of land and lies entirely within Fremont County, so a hangar site can be on a ranch lot, beside a private strip or on land that needs a separate approval. We ask where the building will stand and who has to approve it before we draw anything, because the answer sets the schedule.

Reaching Arapahoe from Riverton

Riverton's center lies roughly 8 miles northeast of the Arapahoe School by way of Rendezvous Road, which is the route most delivery trucks and trade partners use. Short hauls help on a hangar, because wide-span frame members and door sections are long and fragile.

We also build in Riverton, Lander and Thermopolis, so a crew working in one town can often take a hangar job in the next. We confirm the delivery date with the site contact and the driver the week before.

Approvals, loads and the door header

Different owners deal with different reviewers, so we find out who permits your hangar before the drawings are done. We then include the snow, wind and frost values for the parcel on the permit set and have the engineer seal the frame.

The door header deserves its own attention. A wide hangar door puts a heavy load on the header and the columns beside it, and the foundation under the door tracks must stay flat. We detail all of it and confirm the final opening dimensions before the steel is ordered. Changing the opening afterward means redrawing the frame.

Doors, panels and add-ons

The door is often the most expensive single item in a hangar. Our overhead hangar doors page compares bifold, hydraulic and sliding types by cost, speed and wind rating. For a larger operation, a second bay or a shop wing can be added later, and our building additions page covers how we plan for it.

Walls and roof panels come in single-skin and insulated versions. Insulated panels cost more but hold heat and reduce condensation, which protects aircraft and tools. If you only need cover from sun, wind and hail, a single-skin building is cheaper, and we can price both.

Aviation and the businesses around it

Our aviation page describes the owners who use these buildings, from private pilots to small maintenance operators. Many buyers also run ranches, farms or contracting businesses and want a shop or storage building on the same property. We design those with the same steel and panels.

Schools and community organizations are also local building owners. Fremont County School District #38 serves most of the area, and Arapahoe is also home to St. Stephens Indian School. A school or district may need a bus barn, a shop or an equipment shed, and we can build one using the same engineering process. See our aircraft hangar page for hangar layouts.

Wind, dry ground and a long approach

The semi-arid climate gives many dry building days, which helps the schedule. It also means dust and a hard, dry soil surface. We water the pad before compaction when needed and check the drainage so that a rare heavy rain does not pond at the door.

Wind is the daily call on a hangar site. Panels catch it, and frames are most vulnerable before bracing and sheeting are complete. We stop lifts when gusts rise, brace everything before leaving the frame overnight and keep the work crews informed. A clear plan for staging, crane position and the order of erection helps the day go as intended, and we share it with the owner the day before so nobody is surprised by where the crane sits.

Writing the schedule around the steel

The longest item is usually the frame or the door package, so we order those first. The foundation is placed while steel is made, and erection starts when delivery arrives. We give you the dates in writing at signing and update them as drawings are approved.

If your timing is tight, tell us at the quote stage. We can phase the work, ordering long-lead items first, or build a smaller hangar now and plan an expansion. A written schedule is a promise we keep or revise early, and we tell you when something slips instead of hoping it will recover.

What the proposal covers

The proposal covers engineering, the steel frame, the door system, roof and wall panels, trim and erection coordination. It lists exclusions such as grading, utilities, apron paving and electrical service. If you want them handled, we coordinate the trades and show the cost clearly.

A typical hangar here is a single clear-span building with one large door and a small side door. The door opening, not the floor area, usually sets the cost. Some owners add a lean-to for tools or a heated shop room, and we draw those into the same frame. The base product is a pre-engineered metal building with options added to suit the use.

Price a hangar in Arapahoe

Send us the aircraft, the wingspan and tail height, the parcel and when you want to start. We will send a price per square foot, a steel and door lead time and a written list of what is included.

Common Questions

What does a hangar cost per square foot?

It varies with span, height, door type and insulation. We do not quote a price before we know the aircraft and the use. Once we do, we give a price per square foot for the shell and list the extras on their own lines.

Who approves a hangar on reservation land?

The reviewer depends on the owner and the land status. We ask early who permits and inspects the project, then prepare the plans to suit. We keep all the approvals together for your records.

How wide should the door be?

Wider than the wingspan by enough to tow safely. We confirm the aircraft, the tail height and the tow equipment, then show the opening on a drawing before the order is placed.

Can a hangar be heated?

Yes. We insulate the walls and roof, detail the door seals and frame for unit heaters. Heat and electrical are done by licensed trades, and we coordinate so the penetrations line up.

How long does it take?

Drawings and permits come first, then fabrication, which is the longest step, then delivery and erection. We give the dates in writing and update them as the order moves.

Related

Ready to talk about your project?